← The Centralia Wire
Infrastructure

SR 512 ramp closed in Puyallup for maintenance

🔊 Listen · narrated by Aiden

The ramp from 9th Street SW to westbound SR 512 in Puyallup will close from 10 a.m. to 4 p.m. Tuesday, Sept. 8, for maintenance work, according to WSDOT.

Travelers should detour to the 31st Avenue SW ramp during the closure, WSDOT says. The closure is scheduled to end at 4 p.m., with no mention of extended work.

The closure affects drivers heading westbound on SR 512 from 9th Street SW. Detours are in place to minimize disruption.

📄 Source: WSDOT — Highway Construction & Closures — https://wsdot.wa.gov/travel/road-construction
Source receipts3 of 6 claims supported · 50%

Legacy automated check: the original source text was not preserved. These earlier verdicts have not passed the current publication checks and may contain errors. Source: original document ↗

  • ✓
    The ramp from 9th Street SW to westbound SR 512 in Puyallup will close from 10 a.m. to 4 p.m. Tuesday“512 [43 mi from Centralia–Chehalis]: From 10 a.m.. to 4 p.m. Tuesday, Sept. 8, the ramp from 9th Street SW to westbound SR 512 in Puyallup will close for maintenance. During the work, travelers will detour to the 31st Avenue SW ramp.”
  • ⚠
    The closure is scheduled to end at 4 p.m.No usable supporting receipt — unverified.
  • ✓
    The closure is scheduled to end on Sept. 8“Expected end: Sep 8, 2026, 10:00 AM”
  • ✓
    Travelers should detour to the 31st Avenue SW ramp during the closure“During the work, travelers will detour to the 31st Avenue SW ramp.”
  • ⚠
    The closure affects drivers heading westbound on SR 512 from 9th Street SWNo usable supporting receipt — unverified.
  • ⚠
    Detours are in place to minimize disruptionNo usable supporting receipt — unverified.

The Centralia Wire is free. Get Centralia–Chehalis's news delivered every morning.