← The Centralia Wire
Infrastructure

SR 6 lane closures Nov. 2-5

🔊 Listen · narrated by Aiden

Travelers in both directions of SR 6 will take turns moving through a single lane daily from 6:30 a.m. to 4 p.m. between the US 101 interchange and Katula Road.

Closures are scheduled from Nov. 2 to Nov. 5, with work ending at 4 p.m. on Nov. 5.

📄 Source: WSDOT — Highway Construction & Closures — https://wsdot.wa.gov/travel/road-construction
Source receipts4 of 4 passages supported · 100%

Automated checks compare the headline, summary and each body passage with the saved source. A checkmark records the model’s assessment; readers can inspect the quote. Source: original document ↗

  • ✓
    SR 6 lane closures Nov. 2-5“006 [37 mi from Centralia–Chehalis]: Monday, Nov. 2 to Thursday, Nov. 5: Travelers in both directions of SR 6 between the US 101 interchange (milepost 0.00) and Katula Road (milepost 30.0) will take turns moving through a single lane daily from 6:30 a.m. to 4 p.m., for moving. Slow down, stay focused and expect delays. Effective: Nov 2, 2026, 5:00 AM Expected end: Nov 5, 2026, 4:00 PM Source: https://wsdot.wa.gov/travel/road-construction”
  • ✓
    Single-lane traffic on SR 6 between US 101 and Katula Road, Nov. 2-5, 6:30 a.m. to 4 p.m. daily.“006 [37 mi from Centralia–Chehalis]: Monday, Nov. 2 to Thursday, Nov. 5: Travelers in both directions of SR 6 between the US 101 interchange (milepost 0.00) and Katula Road (milepost 30.0) will take turns moving through a single lane daily from 6:30 a.m. to 4 p.m., for moving.”
  • ✓
    Travelers in both directions of SR 6 will take turns moving through a single lane daily from 6:30 a.m. to 4 p.m. between the US 101 interchange and Katula Road.“Travelers in both directions of SR 6 between the US 101 interchange (milepost 0.00) and Katula Road (milepost 30.0) will take turns moving through a single lane daily from 6:30 a.m. to 4 p.m., for moving.”
  • ✓
    Closures are scheduled from Nov. 2 to Nov. 5, with work ending at 4 p.m. on Nov. 5.“Effective: Nov 2, 2026, 5:00 AM Expected end: Nov 5, 2026, 4:00 PM”
Source text saved for this check (2026-11-04T08:13:58.062Z)
006 [37 mi from Centralia–Chehalis]: Monday, Nov. 2 to Thursday, Nov. 5: Travelers in both directions of SR 6 between the US 101 interchange (milepost 0.00) and Katula Road (milepost 30.0) will take turns moving through a single lane daily from 6:30 a.m. to 4 p.m., for moving. 

Slow down, stay focused and expect delays.
Effective: Nov 2, 2026, 5:00 AM
Expected end: Nov 5, 2026, 4:00 PM
Source: https://wsdot.wa.gov/travel/road-construction

The Centralia Wire is free. Get Centralia–Chehalis' news delivered every morning.