← The Centralia Wire
Infrastructure

SR 6 lane shift for utility work Oct. 21

🔊 Listen · narrated by Aiden

Travelers in both directions of SR 6 between Chilvers Road (milepost 49.2) and Scheuber Road (milepost 49.4) will take turns moving through a single open lane from 9 a.m. to 3 p.m. on Wednesday, Oct. 21, for utility work.

Flaggers will direct travelers through the area, with expected delays during the work period.

📄 Source: WSDOT — Highway Construction & Closures — https://wsdot.wa.gov/travel/road-construction
Source receipts4 of 4 passages supported · 100%

Automated checks compare the headline, summary and each body passage with the saved source. A checkmark records the model’s assessment; readers can inspect the quote. Source: original document ↗

  • ✓
    SR 6 lane shift for utility work Oct. 21“006 [6 mi from Centralia–Chehalis]: Wednesday, Oct. 21: Travelers in both directions of SR 6 between Chilvers Road (milepost 49.2) and Scheuber Road (milepost 49.4) will take turns moving through a single open lane from 9 a.m. to 3 p.m., for utility work. Flaggers will direct travelers through the area. Plan ahead and expect delays. Effective: Oct 21, 2026, 5:00 AM Expected end: Oct 21, 2026, 3:00 PM”
  • ✓
    One-lane traffic on SR 6 between Chilvers and Scheuber Roads from 9 a.m. to 3 p.m. Oct. 21 for utility work, with flaggers directing traffic.“006 [6 mi from Centralia–Chehalis]: Wednesday, Oct. 21: Travelers in both directions of SR 6 between Chilvers Road (milepost 49.2) and Scheuber Road (milepost 49.4) will take turns moving through a single open lane from 9 a.m. to 3 p.m., for utility work. Flaggers will direct travelers through the area. Plan ahead and expect delays.”
  • ✓
    Travelers in both directions of SR 6 between Chilvers Road (milepost 49.2) and Scheuber Road (milepost 49.4) will take turns moving through a single open lane from 9 a.m. to 3 p.m. on Wednesday, Oct. 21, for utility work.“006 [6 mi from Centralia–Chehalis]: Wednesday, Oct. 21: Travelers in both directions of SR 6 between Chilvers Road (milepost 49.2) and Scheuber Road (milepost 49.4) will take turns moving through a single open lane from 9 a.m. to 3 p.m., for utility work. Flaggers will direct travelers through the area. Plan ahead and expect delays.”
  • ✓
    Flaggers will direct travelers through the area, with expected delays during the work period.“Flaggers will direct travelers through the area. Plan ahead and expect delays.”
Source text saved for this check (2026-10-21T12:50:12.077Z)
WSDOT highway construction and road closures within 50 miles of Centralia–Chehalis — 10/21/2026:

006 [6 mi from Centralia–Chehalis]: Wednesday, Oct. 21: Travelers in both directions of SR 6 between Chilvers Road (milepost 49.2) and Scheuber Road (milepost 49.4) will take turns moving through a single open lane from 9 a.m. to 3 p.m., for utility work. 

Flaggers will direct travelers through the area. Plan ahead and expect delays.
Effective: Oct 21, 2026, 5:00 AM
Expected end: Oct 21, 2026, 3:00 PM

012 [12 mi from Centralia–Chehalis]: From 7:30 p.m. Monday, Aug. 10, and continuing weeknights from 7:30 p.m. to 6 a.m.: Travelers in both directions of US 12 between I-5 (milepost 66.5) and Kennedy Road (milepost 77.4) will take turns moving through one open lane at a time for paving and bridge joint repair work.

Flaggers will direct travelers to follow a pilot car through the work zone. Plan ahead and expect delays of up to 20 minutes in each direction.
Effective: Aug 12, 2026, 12:00 PM

706 [46 mi from Centralia–Chehalis]: From 9 p.m. Friday, Oct. 23, to 6 a.m. Saturday, Oct. 24, SR 706 will close at Kernahan Road East for maintenance crews to replace a failing culvert.
During the overnight closure there will be no access from SR 706 to the Nisqually Entrance of Mount Rainier National Park. Read the news release.
Effective: Oct 20, 2026, 8:59 AM
Expected end: Oct 24, 2026, 5:00 AM

161 [49 mi from Centralia–Chehalis]: Both directions of State Route 161 in Federal Way and Milton will reduce to one lane from 9 p.m. to 5 a.m. nightly Monday, Oct. 19, through Friday morning, Oct. 23, between South 370th Street and Military Road South for construction. 

At least one lane of SR 161 will remain open through this area each night.
Effective: Oct 19, 2026, 3:15 PM
Expected end: Oct 23, 2026, 5:00 AM

The Centralia Wire is free. Get Centralia–Chehalis' news delivered every morning.