Automated checks compare the headline, summary and each body passage with the saved source. A checkmark records the model’s assessment; readers can inspect the quote. Source: original document ↗
- ✓
SR 6 work zone begins Nov. 2“006 [18 mi from Centralia–Chehalis]: Monday, Nov. 2 to Tuesday, Nov. 30: Travelers in both directions of SR 6 between Mauerman Road (milepost 29.7) and Stevens Road (milepost 33.1) will take turns moving through a single lane each day from 7 a.m. to 5:30 p.m., for tree trimming around power lines.”
- ✓
Work zone on SR 6 between Mauerman and Stevens roads begins Monday, Nov. 2, for tree trimming around power lines.“006 [18 mi from Centralia–Chehalis]: Monday, Nov. 2 to Tuesday, Nov. 30: Travelers in both directions of SR 6 between Mauerman Road (milepost 29.7) and Stevens Road (milepost 33.1) will take turns moving through a single lane each day from 7 a.m. to 5:30 p.m., for tree trimming around power lines.”
- ✓
Travelers in both directions of SR 6 between Mauerman Road (milepost 29.7) and Stevens Road (milepost 33.1) will take turns moving through a single lane each day from 7 a.m. to 5:30 p.m. for tree trimming around power lines.“006 [18 mi from Centralia–Chehalis]: Monday, Nov. 2 to Tuesday, Nov. 30: Travelers in both directions of SR 6 between Mauerman Road (milepost 29.7) and Stevens Road (milepost 33.1) will take turns moving through a single lane each day from 7 a.m. to 5:30 p.m., for tree trimming around power lines.”
- ✓
Flaggers will direct travelers through the work zone. Slow down, have patience and expect delays.“Flaggers will direct travelers through the work zone. Slow down, have patience and expect delays.”
Source text saved for this check (2026-11-03T08:32:41.277Z)
WSDOT highway construction and road closures within 50 miles of Centralia–Chehalis — 11/3/2026:
006 [18 mi from Centralia–Chehalis]: Monday, Nov. 2 to Tuesday, Nov. 30: Travelers in both directions of SR 6 between Mauerman Road (milepost 29.7) and Stevens Road (milepost 33.1) will take turns moving through a single lane each day from 7 a.m. to 5:30 p.m., for tree trimming around power lines.
Flaggers will direct travelers through the work zone. Slow down, have patience and expect delays.
Effective: Nov 2, 2026, 5:00 AM
Expected end: Nov 30, 2026, 5:30 PM
005 [21 mi from Centralia–Chehalis]: Maintenance has the left lane closed on I-5 northbound from milepost 59 near Exit 59 / Cowlitz River to milepost 63 near SR 505 beginning at 8:53 pm on November 2, 2026 until further notice. Please use caution
Effective: Nov 2, 2026, 8:53 PM
006 [37 mi from Centralia–Chehalis]: Monday, Nov. 2 to Thursday, Nov. 5: Travelers in both directions of SR 6 between the US 101 interchange (milepost 0.00) and Katula Road (milepost 30.0) will take turns moving through a single lane daily from 6:30 a.m. to 4 p.m., for moving.
Slow down, stay focused and expect delays.
Effective: Nov 2, 2026, 5:00 AM
Expected end: Nov 5, 2026, 4:00 PM
105 [42 mi from Centralia–Chehalis]: Monday, Nov. 2 to Thursday, Nov. 5: Travelers in both directions of SR 105 between mileposts 6.8 and 7.1, will take turns moving through a single lane each day from 7 a.m. to 4 p.m., for work to build up the shoulder along the roadway.
Flaggers will direct travelers through the area. Plan ahead and expect delays.
Effective: Nov 2, 2026, 5:00 AM
Expected end: Nov 5, 2026, 4:00 PM
161 [46 mi from Centralia–Chehalis]: From 7 a.m. to 3:30 p.m. Tuesday, Nov. 3 through Thursday, Nov. 5, the road will reduce to one lane between 36th Street East and Dechaux Road East. The lane reduction creates a work zone for Washington State Department of Transportation maintenance crews to prepare the roadway for winter weather. For more information, visit the project webpage.
Effective: Oct 30, 2026, 11:00 AM
Expected end: Nov 5, 2026, 4:35 PM